Asset Report
Romero gold mine
Report summary
The project is owned and currently being developed by Goldquest Mining Corp. A preliminary economic assessment study on the project was released in Q2, 2015. The study assumes a 10 year operation with underground mining using using longhole and drift & fill with cemented paste backfill. The ore is to be treated in a 2.5kt/d mill and conventional flotation plant producing a gold and copper containing copper concentrate. Initial pre-production capital cost has been estimated at US$143 million.
Table of contents
- Summary
- Key Issues
- Mining
Tables and charts
This report includes 1 images and tables including:
- Detailed Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,250
Asset Report
Dee (Closed) gold mine
A detailed analysis of the Dee (Closed) gold mine.
$2,250
Asset Report
Sipan (Closed) gold mine
A detailed analysis of the Sipan (Closed) gold mine.
$2,250