Asset Report
Rosia Montana gold mine project
Report summary
Rosia Montana will be mined as conventional open-pit operations. The mine has a projected life of 16 years. The plant will have a design capacity of 13.4Mt/a. Due to political instability and failure of legislative initiatives in 2013, the accompanying analysis is for illustrative purposes only, and Wood Mackenzie assumes production will not begin before 2028. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Tocantinzinho gold mine project
A detailed analysis of the Tocantinzinho gold mine project.
$2,250
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250