Rosia Montana will be mined as conventional open-pit operations. The mine has a projected life of 16 years. The plant will have a design capacity of 13.4Mt/a. Due to political instability and failure of legislative initiatives in 2013, the accompanying analysis is for illustrative purposes only, and Wood Mackenzie assumes production will not begin before 2028. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Rosia Montana gold mine project

    XLS 119.50 KB

  • Document

    Rosia Montana gold mine project

    PDF 1.19 MB

  • Document

    Rosia Montana gold mine project

    ZIP 1.01 MB