Asset Report
Rubtsovsky copper mine
Report summary
Rubtsovsky is an underground mine and mill operation. There is potential to extend mine life beyond 2020 if further reserves can be identified. Capacity output is 400kt/a ore, approximately 25kt/a Zn and 15kt/a Pb. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
11 February 2021
Boleo SxEw copper mine
Asset Report
Boleo SxEw copper mine
A detailed analysis of the Boleo SxEw copper mine.
$2,25004 September 2020
Palabora copper mine
Asset Report
Palabora copper mine
A detailed analysis of the Palabora copper mine.
$2,25011 February 2021
Gaisky GOK copper mine
Asset Report
Gaisky GOK copper mine
A detailed analysis of the Gaisky GOK copper mine.
$2,250