Asset report

Shandong Xinhai EAF nickel operation

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Located in Junan Town Linyi City Shandong. Founded in November 2007 the operation consists of four 25MVA electric arc furnaces with a combined capacity of 72kt/a FeNi grading between 10 13% Ni although 4 6% NPI can also be made. The total investment was RMB 480M and came into production in April 2008. High power prices in Shandong have limited production to date. An expansion to 400kt/a (from the current 72kt/a) is under consideration This would involve the addition of a further 6...

What's included

This report contains

  • Document

    Shandong Xinhai EAF nickel operation

    XLS 267.50 KB

  • Document

    Shandong Xinhai EAF nickel operation

    PDF 613.98 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898