Asset Report
Shandong Xinhai EAF nickel operation
Report summary
Located in Junan Town, Linyi City, Shandong. Founded in November 2007, the operation consists of four 25MVA electric arc furnaces with a combined capacity of 72kt/a FeNi grading between 10-13% Ni, although 4-6% NPI can also be made. The total investment was RMB 480M and came into production in April 2008. High power prices in Shandong have limited production to date. An expansion to 400kt/a (from the current 72kt/a) is under consideration This would involve the addition of a further 6...
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Zhanhua Weiye EAF nickel operation
A detailed analysis of the Zhanhua Weiye EAF nickel operation.
$2,250
Asset Report
Fujian Desheng EAF nickel operation
A detailed analysis of the Fujian Desheng EAF nickel operation.
$2,250
Asset Report
Nickel Pig Iron EAF nickel operation
A detailed analysis of the Nickel Pig Iron EAF nickel operation.
$2,250