Asset Report

Sleeper gold mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

08 March 2019

Sleeper gold mine project

Report summary

The Sleeper project is a former high-grade open pit operation. A Preliminary Economic Assessment was completed in December 2015 with the aim to restart operations treating relatively low grade ore by heap leaching process methods. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Sleeper gold mine project

    XLS 118.00 KB

  • Document

    Sleeper gold mine project

    PDF 1.07 MB

  • Document

    Sleeper gold mine project

    ZIP 1.04 MB

Trusted by leading organisations