Asset report

South African Land & Exploration (Sallies) (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

S.A. Land operated as an underground mining operation from 1938-1976.  The mine plant has retreated surface dumps since 1977.  The majority of material is brought in from outside sources. Prior to closure of the underground workings, the mine received state assistance for one year, 1976, totalling R2.18M. The company dewatered the Van-Dyke No 5 shaft in the early 1980's but values proved disappointing.

What's included

This report contains

  • Document

    South African Land & Exploration (Sallies) (Closed) gold mine

    XLS 115.50 KB

  • Document

    South African Land & Exploration (Sallies) (Closed) gold mine

    PDF 404.54 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Kimbo bauxite mine

Asset report

Kindia bauxite mine

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898