Asset Report
Springs zinc smelter
Report summary
The Springs smelter was commissioned in 1969 to supply South Africa's zinc requirements, which were largely for galvanising. The initial capacity was 50kt/a slab zinc, finally expanding to around 120. The plant was orignally operated by Zincor but in 2006 the plant became part of Exxaro. In 2009, Exxaro attempted to sell the smelter as part of its zinc disinvestment activities. No buyer was found and the plant closed at the end of 2011.
Table of contents
- Location / Transport
- Conc. Receipt / Storage
- Roaster
- Acid Plant
- Leach Plant
- Purification
- Tankhouse
- Casting Plant
- Residue Disposal
- Other
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hindustan Zinc (Pre-2005) (Closed) zinc mine
A detailed analysis of the Hindustan Zinc (Pre-2005) zinc mine.
$2,250
Asset Report
Valleyfield zinc smelter
A detailed analysis of the Valleyfield zinc smelter.
$2,250
Asset Report
Tak zinc smelter
A detailed analysis of the Tak zinc smelter.
$2,250