Asset Report
Sungun gold mine
Report summary
Sungun is a large open pit operation 2,200km from NICICO's Sarcheshmeh copper complex. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Operating
- CAPEX
- Mining
-
Process
- Copper Concentrator
- Molybdenum Circuit
- Copper Smelter
- Slag Concentrator
- Byvlychyng Cathode Plant
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
17 November 2021
Gold Ridge Restart (Closed) gold mine
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,25005 August 2021
YuanYang gold mine
Asset Report
YuanYang gold mine
A detailed analysis of the YuanYang gold mine.
$2,25022 December 2015
Qed (Closed) gold mine
Asset Report
Qed (Closed) gold mine
A detailed analysis of the Qed (Closed) gold mine.
$2,250