Asset report

Tabakoto (including Ségala) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The property comprises the Tabakoto and Segala mines and the Kofi Nord mine permits (9 deposits located north west of the Tabakoto plant). Tabakoto is a combined open pit and underground operation with a 4kt/d gravity / carbon in leach (CIL) plant for ore processing. It is a high cost operation with a company reported mine site all in sustaining cost of over US$1 000/oz in 2016. Cost initiatives in place in 2016 and 2017 are expected to result in a fall in the mine site all in sustaining costs to around US$950/oz in 2017.

What's included

This report contains

  • Document

    Tabakoto (including Ségala) gold mine

    PDF 534.94 KB

  • Document

    Tabakoto (including Ségala) gold mine

    XLS 121.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Infrastructure
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898