Asset Report

Taganito nickel operation

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Capital costs have been estimated by the company at US$1.3Bn. The majority of the cost will be used to construct the HPAL plant and the associated infrastructure. The plant requires acid which will be transported from Japan. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions
  • Mining
  • Process

Tables and charts

This report includes 2 images and tables including:

  • Taganito Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Taganito nickel operation

    XLS 573.00 KB

  • Document

    Taganito nickel operation

    PDF 1.53 MB

  • Document

    Taganito nickel operation

    ZIP 1.08 MB