Asset Report
Taganito nickel operation
Report summary
Capital costs have been estimated by the company at US$1.3Bn. The majority of the cost will be used to construct the HPAL plant and the associated infrastructure. The plant requires acid which will be transported from Japan. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Taganito Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Murrin Murrin nickel operation
A detailed analysis of the Murrin Murrin nickel operation.
$2,250
Asset Report
Pamco - Hachinohe nickel operation
A detailed analysis of the Pamco - Hachinohe nickel operation.
$2,250
Asset Report
PT Vale nickel operation
A detailed analysis of the PT Vale nickel operation.
$2,250