Asset Report
Tomago aluminium smelter
Report summary
The smelter is a joint venture between Rio Tinto, Gove Aluminium Finance and Hydro Aluminium. The agreement gives the parties pre-emptive rights if one wishes to sell, with the right to buy at 15% below ‘market value'. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Alumina
- Anode
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 5 images and tables including:
- Tomago Emission Intensity Quartile Ranking - total global production - tonnes Al
- Detailed map
- Process overview
- Products
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kuala Tanjung aluminium smelter
A detailed analysis of the Kuala Tanjung aluminium smelter.
$2,250
Asset Report
Hillside aluminium smelter
A detailed analysis of the Hillside aluminium smelter.
$2,250
Asset Report
Korba (P) aluminium smelter
A detailed analysis of the Korba (P) aluminium smelter.
$2,250