Asset Report
Tongchuan Xinguang aluminium smelter
Report summary
We cost the operation from the start up of the prebake line in 2005. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Alumina Source
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
16 November 2021
Puerto Madryn aluminium smelter
Asset Report
Puerto Madryn aluminium smelter
A detailed analysis of the Puerto Madryn aluminium smelter.
$2,25016 November 2021
Valladolid aluminium smelter
Asset Report
Valladolid aluminium smelter
A detailed analysis of the Valladolid aluminium smelter.
$2,25016 November 2021
Sebree aluminium smelter
Asset Report
Sebree aluminium smelter
A detailed analysis of the Sebree aluminium smelter.
$2,250