Asset Report
Toyoha (Closed) zinc mine
Report summary
The veins were rediscovered in the late 1890s, but it was not before 1914 that development began on the mine. The mine closed in 1921, but reopened in 1937 only to be closed again in 1945. With a capital investment of Y60M in 1950, the mine was re-opened and remained in production until closure on depletion of reserves in 2006. In 1962 the Toyoha Mine Co. was merged with Nippon Mining. In 1981 the high-grade Shinano vein was discovered (4.5Mt grading 270g/t Ag, 0.7%Cu, 2%Pb, 13% Zn). ...
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
15 February 2021
Touissit (closed) zinc mine
Asset Report
Touissit (closed) zinc mine
A detailed analysis of the Touissit (Closed) zinc mine.
$2,25020 April 2023
Brunswick (Closed) zinc mine
Asset Report
Brunswick (Closed) zinc mine
A detailed analysis of the Brunswick zinc mine.
$2,25017 November 2021
Duck Pond (closed) zinc mine
Asset Report
Duck Pond (closed) zinc mine
A detailed analysis of the Duck Pond zinc mine.
$2,250