Asset report

Trojan nickel operation

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

A fully integrated facility with electric furnace smelter and leach electrowin refinery. The smelter and refinery ceased production in 2009 and the company is currently evaluating options to restart the smelter. Mining recommenced in 2013 from the Trojan mine.

What's included

This report contains

  • Document

    ButNi.xls

    XLS 729.00 KB

  • Document

    Trojan nickel operation

    PDF 324.95 KB

Table of contents

Tables and charts

This report includes 9 images and tables including:

Images

  • Production: Image 1
  • Costs: Image 1
  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Costs: Table 1

You may be interested in

Asset report

Kimbo bauxite mine

Asset report

Kindia bauxite mine

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898