Asset Report

Trojan nickel operation

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

A fully integrated facility with electric furnace smelter and leach electrowin refinery. The smelter and refinery ceased production in 2009 and the company was evaluating options to restart the smelter. Mining recommenced in 2013 from the Trojan mine. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

This report includes 4 images and tables including:

What's included

This report contains:

  • Document

    ButNi.xls

    XLS 659.00 KB

  • Document

    Trojan nickel operation

    PDF 1.27 MB

  • Document

    Trojan nickel operation

    ZIP 992.36 KB