Asset Report

Twangiza gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Twangiza is an open pit operation that utilises conventional hydraulic excavator and haul truck mining methods. The process plant capacity was expanded in 2014 from 1.3Mt/a to 1.7Mt/a. Processing comprises three stage crushing, ball milling, gravity recovery, CIL, elution and gold smelting.Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Twangiza gold mine

    XLS 122.00 KB

  • Document

    Twangiza gold mine

    PDF 1.22 MB

  • Document

    Twangiza gold mine

    ZIP 1.04 MB