Asset Report
Uralsk (P) aluminium smelter
Report summary
The prebake lines were commissioned in 1994 to eventually replace the Søderberg lines, which came online in 1939. The Søderberg lines closed in 2009. The smelter has two casthouses. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Alumina Source
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Qingtongxia (P) aluminium smelter
A detailed analysis of the Qingtongxia (P) aluminium smelter.
$2,250
Asset Report
Fushun (P) aluminium smelter
A detailed analysis of the Fushun (P) aluminium smelter.
$2,250
Asset Report
Yunnan (P) aluminium smelter
A detailed analysis of the Yunnan aluminium smelter.
$2,250