Asset report

Volta Grande gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

A positive feasibility on the project was released in May 2015. Initial plant capacity will be 3.5Mt/a and increasing to 7Mt/a by year 3. Conventional open pit mining methods will be used and the processing flow sheet consists of primary crushing gravity concentration of coarse gold carbon in pulp and carbon in leach and recovery of gold by adsorption to produce a gold dore. Over 18 years average annual gold is estimated at 205koz.

What's included

This report contains

  • Document

    Volta Grande Project gold mine

    XLS 121.50 KB

  • Document

    Volta Grande gold mine project

    PDF 600.73 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898