Asset Report
Volta Grande gold mine project
Report summary
The Volta Grande project includes two lateritic and saprolitic gold type deposits, Ouro Verde and Grota Seca. A two phased approach is planned, first with a processing capacity of 3.5Mt/a of ore and then increasing to 7Mt/a by year 3. Conventional open pit mining methods will be used. Processing will consist of primary crushing, gravity concentration, carbon in pulp, carbon in leach and recovery of gold by adsorption to produce a gold dore. Over the 18 year mine life, average annual production is 205koz.
Table of contents
- Summary
- Key issues
- Mining
-
Processing
- Power
- CAPEX
- Operating
- Royalties & Taxes
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tambo Grande gold mine project
A detailed analysis of the Tambo Grande gold mine project.
$2,250
Asset Report
Wasamac gold mine project
A detailed analysis of the Wasamac gold mine project.
$2,250
Asset Report
Golpu gold mine project
A detailed analysis of the Golpu gold mine project.
$2,250