Asset Report

Volta Grande gold mine project 

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

29 March 2018

Volta Grande gold mine project 

Report summary

The Volta Grande project includes two lateritic and saprolitic gold type deposits, Ouro Verde and Grota Seca. A two phase approached is planned, first one with a processing capacity of 3.5Mt/a of ore and increasing to 7Mt/a by year 3. Conventional open pit mining methods will be used on two deposits and the process flow sheet is relatively straight forward consisting of primary crushing, gravity concentration of coarse gold, carbon in pulp and carbon in leach and recovery of gold by adsorption to produce a gold dore. Over the 18 year mine life, average annual production is 205koz.

Table of contents

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Detailed map

What's included

This report contains:

  • Document

    Volta Grande Project gold mine

    XLS 121.50 KB

  • Document

    Volta Grande gold mine project

    PDF 605.57 KB

Other reports you may be interested in

Browse reports by Industry Sector