Asset Report

Vung Ang steel plant

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

18 December 2019

Vung Ang steel plant

Report summary

In 2011 Formosa began construction of their Ha Tinh integrated steel plant. It will eventually produce 6.5Mtpa of crude steel and could expand further. Commissioning was severely delayed and did not occur until 2017. Problems included the release of untreated waste water that killed millions of fish. The plant was fined US$500M and needed to install dry coke quenching before steelmaking resumed. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Iron ore
  • Coal
  • Metallics
  • Energy
  • Capital costs
  • Operating cash costs

Tables and charts

This report includes 11 images and tables including:

  • Detailed map
  • Participation
  • Steel plant overview
  • Key raw materials
  • Downstream products
  • Finished steel production
  • Production table (Mt)
  • Capital costs
  • Total operating cash costs: Finished steel
  • Operating cash cost table

What's included

This report contains:

  • Document

    Vung Ang.xls

    XLS 294.00 KB

  • Document

    Vung Ang steel plant

    PDF 1.07 MB

  • Document

    Vung Ang steel plant

    ZIP 1.09 MB

Trusted by leading organisations