Wakayama steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Iron ore
- Coal
- Coke
- Metallics
-
Energy
- Downstream products
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapFinished steel cost (US$/tonne)
-
Operation cash costs table (US$/tonne)Economic assumptionsFinal steel production (Mt)Production table (Mtpa)
What's included
This report contains:
Other reports you may be interested in
Steel short-term outlook January 2023
Steel to evoke the tale of two halves in 2023
$5,000Gary steel plant
Integrated steelworks in Indiana, supplying the auto sector. One large BF and two flexible units. Full reliance on external coke.
$2,250MLNG upstream fields
The MLNG PSC covers eight gas fields offshore Sarawak and was awarded in April 1997, replacing the 1976 Sarawak Shell PSC.
$3,720