Asset Report
Xian zinc smelter
Report summary
The original smelter was a 15kt/a unit at Mei Xian, 150km west of Xi'an. Construction of a larger plant of 35kt/a capacity, the Xian smelter, commenced in 1998. This operation was commissioned in June 2002 and was situated in the southern suburbs of Xi'an. Production never reached the 35kt/a level, and this allied to its urban location lead to the smelter being closed in 2013.
Table of contents
- Summary
- Location / Transport
- Conc. Receipt / Storage
- Roaster
- Acid Plant
- Leach Plant
- Purification
- Tankhouse
- Casting Plant
- Residue Disposal
- Other
Tables and charts
This report includes 2 images and tables including:
- Detailed map
- Flowsheet
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mian Xian (Bayi) zinc smelter
A detailed analysis of the Mian Xian (Bayi) zinc smelter.
$2,250
Asset Report
Xiangfen zinc smelter
A detailed analysis of the Xiangfen zinc smelter.
$2,250
Asset Report
Xiangfen (Electric) zinc smelter
A detailed analysis of the Xiangfen (Electric) zinc smelter.
$2,250