Asset Report

Xian zinc smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The original smelter was a 15kt/a unit at Mei Xian, 150km west of Xi'an. Construction of a larger plant of 35kt/a capacity, the Xian smelter, commenced in 1998. This operation was commissioned in June 2002 and was situated in the southern suburbs of Xi'an. Production never reached the 35kt/a level, and this allied to its urban location lead to the smelter being closed in 2013.

Table of contents

  • Summary
  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Leach Plant
  • Purification
  • Tankhouse
  • Casting Plant
  • Residue Disposal
  • Other

Tables and charts

This report includes 2 images and tables including:

  • Detailed map
  • Flowsheet

What's included

This report contains:

  • Document

    Xian zinc smelter

    PDF 1.22 MB