Asset Report

Yangquan alumina refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The 600kt/a expansion project was completed by September 2012, but commissioning was delayed to end of 2013. Bauxite and caustic soda are both captive to the plant allowing control over the major inputs costs. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Bauxite
  • Caustic soda and lime
  • Digestion
  • Calcining
    • Red Mud
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Yangquan alumina refinery

    XLS 120.00 KB

  • Document

    Yangquan bauxite mine

    XLS 89.00 KB

  • Document

    Yangquan alumina refinery

    PDF 1.23 MB

  • Document

    Yangquan alumina refinery

    ZIP 1.06 MB