Asset Report
Yimei alumina refinery
Report summary
The refinery was commissioned in 2005 and SGA goes to the Yichuan smelter. Bauxite is is sourced from third parties. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Bauxite
- Digestion
- Calcining
-
Environmental
- Red Mud
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Pinjarra alumina refinery
Asset Report
Pinjarra alumina refinery
A detailed analysis of the Pinjarra alumina refinery.
$2,25009 December 2022
Damanjodi alumina refinery
Asset Report
Damanjodi alumina refinery
A detailed analysis of the Damanjodi alumina refinery.
$2,25009 December 2022
Utkal alumina refinery
Asset Report
Utkal alumina refinery
A detailed analysis of the Utkal alumina refinery.
$2,250