Asset Report

Youga gold mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

06 September 2019

Youga gold mine

Report summary

Youga is a hard rock contractor operated open pit operation comprising a series of open pits (A2 Main, A2 East, A2 West 1, 2 & 3 pits) and satellite deposits (Balogo and Ouare). Ore is processed in a 1Mt/a gravity / carbon-in-leach (CIL) circuit with average gold recovery around 90%. In 2018, Youga produced 111koz of gold. Based on company guidance, the mine is expected to produce between 110 - 120koz of gold in 2019. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • Royalties & Taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Youga gold mine

    XLS 124.50 KB

  • Document

    Youga gold mine

    ZIP 969.06 KB

  • Document

    Youga gold mine

    ZIP 1.03 MB

Trusted by leading organisations