Asset Report

Youga gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Youga is a hard rock contractor operated open pit operation comprising a series of open pits (A2 Main, A2 East, A2 West 1, 2 & 3 pits) and satellite deposits (Balogo and Ouare). Ore is processed in a 1Mt/a gravity / carbon-in-leach (CIL) circuit with average gold recovery around 90%. In 2018, Youga produced 111koz of gold. Based on company guidance, the mine is expected to produce between 110 - 120koz of gold in 2019. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • Royalties & Taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Youga gold mine

    XLS 126.50 KB

  • Document

    Youga gold mine

    PDF 1.16 MB

  • Document

    Youga gold mine

    ZIP 1.03 MB