From Friday, September 22nd at 4 PM ET until Monday, September 25th, Wood Mackenzie will be experiencing a planned internal system migration. If you need any support during this time, don't hesitate to contact our customer support team using the Webchat below.

Asset Report

Ziar Nad Hronom aluminium smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The prebake lines replaced a Søderberg facility, which ceased production in 1996. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Alumina Sources
  • Anode Sources
    • Power Type
    • Power Source
    • Power Supplier
    • Power Contract

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Ziar Nad Hronom (P) aluminium smelter

    XLS 147.50 KB

  • Document

    Ziar Nad Hronom aluminium smelter

    PDF 1.25 MB

  • Document

    Ziar Nad Hronom aluminium smelter

    ZIP 1.07 MB