Insight

NPI in Indonesia - when and at what cost?

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

An estimation of the capital and operating costs for the development of NPI plant in Indonesia. 

Table of contents

    • The January 12th surprise
    • What will it cost to build a smelter in Indonesia?
      • Reported capital costs of proposed Indonesian NPI projects
      • Chinese proposed NPI projects
      • Existing Chinese NPI plants
    • And what will the operating costs be?
      • Operating cost inputs
    • How much nickel and how soon?
      • Indonesian projects under construction
    • Conclusion

Tables and charts

This report includes 7 images and tables including:

  • NPI in Indonesia - when and at what cost?: Table 1
  • NPI in Indonesia - when and at what cost?: Table 2
  • NPI in Indonesia - when and at what cost?: Table 3
  • NPI in Indonesia - when and at what cost?: Table 4
  • NPI in Indonesia - when and at what cost?: Image 1
  • NPI in Indonesia - when and at what cost?: Image 2
  • NPI in Indonesia - when and at what cost?: Table 5

What's included

This report contains:

  • Document

    NPI in Indonesia - when and at what cost?

    PDF 577.08 KB