Insight
NPI in Indonesia - when and at what cost?
This report is currently unavailable
Report summary
An estimation of the capital and operating costs for the development of NPI plant in Indonesia.
Table of contents
-
Executive Summary
- The January 12th surprise
-
What will it cost to build a smelter in Indonesia?
- Reported capital costs of proposed Indonesian NPI projects
- Chinese proposed NPI projects
- Existing Chinese NPI plants
-
And what will the operating costs be?
- Operating cost inputs
-
How much nickel and how soon?
- Indonesian projects under construction
- Conclusion
Tables and charts
This report includes 7 images and tables including:
- NPI in Indonesia - when and at what cost?: Table 1
- NPI in Indonesia - when and at what cost?: Table 2
- NPI in Indonesia - when and at what cost?: Table 3
- NPI in Indonesia - when and at what cost?: Table 4
- NPI in Indonesia - when and at what cost?: Image 1
- NPI in Indonesia - when and at what cost?: Image 2
- NPI in Indonesia - when and at what cost?: Table 5
What's included
This report contains:
Other reports you may be interested in
Asset Report
Huayue Nickel & Cobalt HPAL - Cobalt project
A detailed analysis of Huaqing Nickel and Cobalt HPAL project
$2,250
Insight
Global upstream fiscal tracker: follow the key discussions in the upstream sector
Global upstream fiscal discussions tracker provides the Wood Mackenzie view on the key fiscal discussions as they unfold.
$1,350
Commodity Market Report
Global nickel strategic planning outlook Q1 2024
Another year and another “crisis” for nickel. Indonesia is "killing the market" but this needs to be worked with rather than around.
$10,000