Future exploration outlook
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
The industry must add 1 trillion boe beyond current plans on existing fields to plug the supply-demand gap to 2050
- Near-term exploration outlook (2025-2030)
- Further analysis and data
Tables and charts
This report includes the following images and tables:
What's included
This report contains:
Other reports you may be interested in
Block 9-2 (Ca Ngu Vang)
Midsize oil, gas and condensate field in Vietnam's Cuu Long Basin, operated by a JOC between Pharos, PTTEP and PVEP
$3,720Polarled
The Polarled pipeline project has been initiated to provide a transport solution for gas fields in a remote area of the Norwegian Sea.
$2,580Tangga Barat Cluster
The Tangga Barat Cluster consists of four dry gas fields in the Malay Basin, 140 kilometres off the east coast of Peninsular Malaysia.
$3,720