Asset Report

Honaker Trail tight gas unconventional play

From

$1,300.00

You can pay by card or invoice

From

$1,300.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Initial Honaker Trail exploration occurred over 40 years ago. Development has always been slow, and the tight gas play is still considered an under-explored target in the Paradox Basin. Low activity levels are partly due to operators being reluctant to deal with the play's complex geology. Although a gas reservoir is present, the source migration pathways and traps are poorly understood. Encana and Cabot, two of the larger operators originally developing the play, both sold out of the...

What's included

This report contains

  • Document

    Data Summary Honaker Trail.xls

    XLS 318.00 KB

  • Document

    Honaker Trail tight gas unconventional play

    PDF 433.42 KB

  • Document

    Honaker Trail tight gas unconventional play

    ZIP 560.80 KB

Table of contents

Tables and charts

This report includes 10 images and tables including:

Tables

  • Key facts: Table 1
  • Honaker Trail geological characteristics
  • Honaker Trail reserves and resources build-up
  • Reserves assumptions
  • Economic assumptions: Table 1
  • Honaker Trail economic metrics

Images

  • Honaker Trail map - commercial area limited to small existing fields in the northeast portion of the basin
  • Position of key companies
  • Economic analysis: Image 1
  • Type well cash flow

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800