A/6-B/4
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Key development metrics
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapA/6-B/4 mapParticipation
-
Hydrocarbon and reservoir qualityDiscovery summaryReserves (2P) at 01/01/2026Production (2011-2020)A/6-B/4 production profileCapital Costs Pre-2015 to 2023 (US$ million)Operating Costs 2011 to 2020 (US$ million)Cash Flow (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ringvei Vest
The Ringvei Vest project includes the development of five fields: Grosbeak, Røver Nord, Røver Sør, Swisher and ...
$3,720Parnassus bauxite mine
A detailed analysis of the Parnassus bauxite mine.
$2,250Greater Ninian Area
The Greater Ninian Area comprises the giant Ninian field and several satellite accumulations. These include the Columba B, D, and E ...
$3,720