Ab-Teymour and Mansuri
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
-
Geology
-
Mansuri field
- Asmari reservoir
- Bangestan reservoir
- Oil quality
- Ab-Teymour field
- Ramin field
-
Mansuri field
- Well data
- Exploration
-
Reserves and resources
- Ab-Teymour
- Mansuri
- Ramin
-
Production
-
Oil
- Mansuri-Asmari
- Mansuri-Bangestan
- Ab-Teymour
- Ramin
- Gas
- Emissions
-
Oil
-
Development
-
Mansuri
- Mansuri-Asmari
- Mansuri-Bangestan
- Ab-Teymour
- Ramin
- AMAK gas gathering project
-
Mansuri
- Infrastructure
-
Costs
- Capital costs
- Operating costs
- 4 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index map
- Detail map
- Participation: Table 1
- Well data: Table 1
- Infrastructure: Table 1
- Sales contracts: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- 14 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ember Resources AB
Ember Resources is a private operator with operations centred in the Alberta Horseshoe Canyon Coal Bed Methane (CBM) fairway.
$3,720Block 192
Block 192 (formerly Block 1-AB) was the top liquids producer in Peru before the Camisea gas/condensate project came onstream in 2004. ...
$3,720Valdemar
Valdemar is a group of several separate oil and gas reservoirs in the Danish Underground Consortium (DUC) Contiguous Area of the North ...
$3,720