Asset Report

Akondo (Weze)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Weze block, 40 kilometres east of Port Gentil, was carved out of the northern section of the Salsich block onshore Gabon in 2012. The acreage contains the small Akondo field which was discovered in 2009, as well as five sub-commercial fields.The Akondo development received approval from the Direction Générale des Hydrocarbures (DGH) in 2012 and was brought onstream in 2015.Production is tied back to the M'Boumba facilities, 35 kilometres to the northeast. Crude is then ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Operating costs
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index map
  • Weze map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Akondo production profile
  • Costs: Table 1
  • 10 more item(s)...

What's included

This report contains:

  • Document

    Akondo (Weze)

    PDF 6.30 MB