Asset Report
Alam El Shawish West
This report is currently unavailable
Report summary
The Alam El Shawish West Block is located in the Abu Gharadig Basin in the Western Desert. Vegas Oil and Gas was awarded the block in the second EGPC Bid Round of 2004 after offering an unprecedented US$41 million signature bonus. The acreage included two undeveloped discoveries - GPAA (now Al Karam) and Najm - made by GPC in the 1980s. The operator successfully appraised the Al Karam discovery and made five further discoveries: Al Assil, Al Barq, Bahga, Al Magd and C-86 that have all been brought onstream. The Assil and Karam project, to develop the gas and condensate reserves in those fields, was sanctioned in 2012 and includes up to six new wells and a new processing facility. First production from the new facility was achieved in November 2014.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Facilities
- Assil & Karam project
- Key development metrics
- Infrastructure
-
Costs
- Exploration costs
- Capital costs
- Abandonment costs
- Operating costs
- Sales contracts
-
Fiscal and regulatory
- Exploration and Appraisal
- Commercial discovery
- Cost/Profit Oil
- Cost/Profit Gas
- Bonuses
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM) File
- Economic analysis
Tables and charts
This report includes 27 images and tables including:
- Key facts: Table 1
- Index map
- Alam El Shawish West detail map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Production profile
- Infrastructure: Table 1
- Sales contracts: Table 1
- Cash flow
- Economic analysis: Table 2
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2023
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2023)
- Remaining PV Price Sensitivities
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Fiscal and regulatory: Table 3
What's included
This report contains:
Other reports you may be interested in
Asset Report
Lower Zakum
The giant Zakum field is located centrally in Abu Dhabi's offshore area. Lower Zakum is the smaller of the two development projects.
$3,100
Asset Report
Bougouni - Lithium mine project
A detailed analysis of the Bougouni lithium mineral project.
$2,250
Asset Report
Western Fields
The Western Fields comprise the Minagish, Umm Gudair, Dharif and Abduliyah oil fields.
$3,100