Bacton (Shell)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
-
Summary
- Pipeline systems
-
Key issues
- Shell and ExxonMobil withdraw from Viaro Energy sale
- Sean System ceases production in 2025
- Potential for a low carbon hub
-
Summary
- Location maps
- Participation
-
Development
- Terminal
- SEAL modifications
- Balgzand Bacton Line (BBL)
- Leman West System (Shell). Current users: Leman West, Corvette, Brigantine, Caravel and Shamrock.
- Sean System
- Sole Pit System. Current users: Sole Pit, Clipper South, Galleon, Cleaver Bank High Project
- SEAL System. Current users: Elgin/Franklin
- Indefatigable System (RockRose)
-
Throughput
- Terminal
-
Pipelines
- Leman West System (Shell)
- Sean System
- Sole Pit System
- Shearwater Elgin Area Line (SEAL)
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Bacton (Shell) mapParticipation: Table 1
-
Development: Table 1Development: Table 2Development: Table 3Development: Table 4Development: Table 5Throughput: Table 1Throughput: Table 2Throughput: Table 3Throughput: Table 4
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Bacton (Perenco)
The Bacton gas terminal is located on the Norfolk coast in the east of England, 32-kilometres north of Great Yarmouth. The complex ...
$2,580Brigantine
Brigantine (previously known as Inde North East) is a collection of four gas fields located 97 kilometres northeast of Bacton on the ...
$3,720Saturn Banks
The Saturn Banks hub (formerly Core) is in the Southern Gas Basin, around 40 kilometres north of the Bacton terminal. It comprises six ...
$3,720