Barrow Island
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Capital Costs
-
Operating Costs
- Excise duty
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Barrow Island Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production Profile
- Pipeline Summary
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Rampside Gas Terminals
The three Rampside Gas terminals (Barrow North, Barrow South and Rivers) lie on the Cumbria coastline, three kilometres southeast of ...
$2,580Bald Hill bauxite mine
Australia Bauxite Ltd. started mining at Bald Hill in 2015.
$2,250Nyhamna
The Nyhamna gas processing terminal is located on the Norwegian island of Gossa in Møre and Romsdal county, 130 kilometres from ...
$2,580