Block 09-3/12 (Ca Tam)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Wells
- Facilities
- Exploration Costs
- Capital Costs
- Operating Costs
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production Profile
- Exploration Costs 2013 to 2018 (US$ million)
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Annual Gas Prices
- Cash Flow (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Angul aluminium smelter
A detailed analysis of the Angul aluminium smelter.
$2,250Gansu Hualu (Baiyin) aluminium smelter
A detailed analysis of the Gansu Hualu (Baiyin) aluminium smelter.
$2,250Chuangyuan Huolinhe aluminium smelter
Chuangyuan Huolinhe smelter is located in eastern Inner Mongolia.
$2,250