Caesar/Tonga
Loading current market price
Report summary
The Caesar/Tonga complex consists of three separately announced oil discoveries in southern Green Canyon. The Tonga discovery was made in 2003, while the Caesar and West Tonga discoveries were announced in 2006 and 2007, respectively. The three original discovery wells were drilled by separate JVs in their respective blocks. These have been unitised and are being jointly developed by a single JV. The three discoveries are understood to be connected and are now considered to be one large ...
What's included
This report contains
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Unitisation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Key Development Metrics
- Wells
- Subsea
- Platform
- Drilling
- Infrastructure
-
Costs
- Exploration and appraisal costs
- Operating costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 21 images and tables including:
Images
- Index Map
- Field Map
- Production Profile
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
- Remaining PV Price Sensitivities
Tables
- Key facts: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Infrastructure: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Participation: Table 1
- Capital costs
- Costs: Table 2
- Costs: Table 3
You may be interested in
Antero Resources - US Northeast
Shell - US Northeast
Shell - US Gulf Coast
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898