Carabobo Project 3
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Historic
- Facilities
- Royalty
- Corporate income taxes
- Windfall taxes
- Cash flow
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapDetail mapParticipation
-
Hydrocarbon and reservoir qualityReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Carabobo Project 1
The Carabobo Project 1 covers two blocks, Carabobo-1 Norte and Carabobo-1 Central. The blocks are located in the eastern area of ...
$3,720Narrabri Gas Project
The Narrabri project is a proposed coal seam gas (CSG) development. It is located in the Gunnedah Basin, NSW.
$3,720Surat Gas Project (Arrow)
The Surat Gas Project is a coal seam gas development in the Surat Basin, southeast Queensland. The project is operated by Arrow Energy.
$3,720