- Summary
-
Key Issues
- Cessation of production is imminent
- Decommissioning will be a significant undertaking
-
Platform
- Subsea
- Secondary recovery
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Clyde
- Leven
- Orion
- Nethan
- Medwin
Tables and charts
This report includes the following images and tables:
-
Pipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Capital Costs 2026 to 2035 (US$ million)
-
Operating Costs 2017 to 2026 (US$ million)Index mapClyde mapParticipationField hydrocarbons characteristicsClyde Area wellsDiscovery summaryReserves (2P) at 01/01/2026Production (2007-2016)
- 27 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Fulmar
The Fulmar oil and gas field is located on the southwest margin of the Central Graben, 270 kilometres east-southeast of Aberdeen. It ...
$3,720Marlim and Voador Area
The giant Marlim oil field was developed as a high priority asset for Petrobras. It was the largest field in terms of reserves until ...
$3,720Gjøa Area
The Gjøa Area consists of three oil and gas fields 60 kilometres north of the Troll Øst field in the Northern North Sea.
$5,280