Clyde Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Cessation of production is imminent
- Decommissioning will be a significant undertaking
-
Platform
- Subsea
- Secondary recovery
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Clyde
- Leven
- Orion
- Nethan
- Medwin
Tables and charts
This report includes the following images and tables:
-
Pipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Capital Costs 2026 to 2035 (US$ million)
-
Operating Costs 2017 to 2026 (US$ million)Index mapClyde mapParticipationField hydrocarbons characteristicsClyde Area wellsDiscovery summaryReserves (2P) at 01/01/2026Production (2007-2016)
- 27 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Enfield Area
The Enfield Area analysis includes the original Enfield Area development, and the newer Greater Enfield project.
$3,720Barossa Area
Barossa is a giant offshore gas and condensate field located around 300 kilometres from Darwin.
$3,720Dvalin Area
Dvalin is a high pressure, high temperature (HP/HT) gas field in the Norwegian Sea.
$5,280