Ecopetrol - Llanos Heavy Oil Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Ecopetrol added a gas-powered energy generation plant to power operations
- Importance of heavy oil for Ecopetrol
- Cost reduction
- History
- Castilla
- Chichimene
- Apiay block fields
- Dilution
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
-
Cash Flow
- Cash Flow for Castilla
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Production (2015-2024)Production Profile: CastillaProduction Profile: Apiay AreaProduction Profile: ChichimeneCapital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2025 to 2034 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 21 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Carabobo Project 3
Carabobo Project 3 covers three blocks - Carabobo 5, Carabobo 2 South and Carabobo 3 - and is located 440 kilometres southeast of ...
$3,720Ecopetrol - Tello
The Tello contract area encompasses the mature Tello oil field and the smaller La Jagua oil field, both of which are producing. ...
$3,720El Corcobo
The El Corcobo cluster includes the CNQ-7 (Puesto Pinto), Gobernador Ayala, and Jaguel Casa de Piedra heavy oil fields, located...
$3,720