Asset Report

Frostpipe

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Frostpipe ceased to transport hydrocarbons in March 2001, after the Frøy and Lille Frigg fields ceased production in 2001 and 1999, respectively. In 2009, Total (now TotalEnergies) submitted the Frostpipe disposal plan and recommended leaving the pipeline in place and trenching it, with rock dumping in places. We assume this work was completed between 2010 and 2014 at a cost of NKr 160 million.The Frostpipe was constructed to transport oil and condensate from the Lille Frigg and ...

Table of contents

  • Decommissioning
  • Capital Costs
  • Operating Costs

Tables and charts

This report includes the following images and tables:

    Pipeline Liquid Throughput ProfilePipeline Liquid Throughput ProfileCapital Costs Pre-2007 to 2013 (NKr million)Capital Costs Pre-2007 to 2013 (NKr million)

What's included

This report contains:

  • Document

    Frostpipe

    XLS 217.00 KB

  • Document

    Frostpipe

    PDF 1.69 MB