Asset Report

Grane Oil Pipeline

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Grane Oil Pipeline runs 220 kilometres from the Grane platform to the Sture terminal, where crude oil is stored in caverns and offloaded into oil tankers for export. It became operational in September 2003 which coincided with production start-up at the Grane oil field.There are several other developments which also utilise the pipeline for export:The Svalin development started exporting oil via the pipeline in 2014. This was the first satellite field to utilise it, as output from Grane ...

Table of contents

    • Cancellation of the Grane-Balder Energy Project (GBEP)
    • Yggdrasil resource upside
    • Historical corporate activity
    • Capital Costs
    • Operating Costs
  • Cash flow
  • Fiscal and regulatory
  • Global Economic Model (GEM) file

Tables and charts

This report includes the following images and tables:

    Transport Cash Flow US$Transport PV Table US$Transport Summary Table US$
    Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Revenue Distribution (Discounted at 10% from 01/01/2026)Transport Cash Flow (Local Currency)Transport PV Table (Local Currency)Transport Summary Table (Local Currency)Grane Oil Pipeline mapOwnership
  • 3 more item(s)...

What's included

This report contains:

  • Document

    Grane Oil Pipeline

    XLS 514.00 KB

  • Document

    Grane Oil Pipeline

    PDF 2.15 MB