Intisar Fields
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Pre-conflict production
- Re-development Programme
- Post contract production
- Emissions
-
Key development metrics
- Wells
- Facilities
- Capital Costs
- Operating Costs
- EPSA IV terms
- Production sharing
- Signature Bonus
- 7 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapIntisar MapParticipation
-
Fields and Producing HorizonsField Hydrocarbon CharacteristicsDiscovery SummaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfilePost Contract Production Profile (post-2037)
- 17 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Shengli Oil Fields
Shengli Oil Fields is Sinopec Corp's largest domestic asset.
$3,720Minor Fields
This analysis covers most of the smaller, mature producing fields in Trinidad and Tobago. The fields can be categorised into joint ...
$3,720Australia offshore ceased fields
This analysis gives a brief description of Australian offshore fields that have ceased producing hydrocarbons.
$3,720