Asset Report

Jolliet/Marquette

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Jolliet (GC 184)/Marquette (GC 52) development encompasses two small, mature oil and gas fields located in the Green Canyon protraction area of the Central Gulf of Mexico. They were co-developed with a deepwater tension-leg well platform (TLWP) located on block GC 184 with a shallow-water drilling, production and processing platform called Central Production Platform, on block GC 52. The Jolliet TLWP was the first tension-leg facility to be installed in the Gulf of Mexico.

Table of contents

  • Summary
    • Operational updates
    • M&A
    • GC 184
    • GC 52 and GC 53
    • Unitisation
    • Jolliet
    • Marquette
    • Jolliet (GC 184)
    • Platform
    • Subsea
    • Drilling
    • 7 more item(s)...
  • Exploration and Appraisal Costs
  • Capital Costs
  • Operating Costs
  • Cash Flow

Tables and charts

This report includes the following images and tables:

  • Capital Costs Pre-2010 to 2017 (US$ million)
  • Operating Costs 2017 to 2025 (US$ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
  • Remaining Present Value Price Sensitivities
  • Index Map
  • Field Map
  • 4 more item(s)...

What's included

This report contains:

  • Document

    Jolliet/Marquette

    XLS 617.50 KB