Asset Report

Kandim-Khauzak-Shadi

From

$2,600.00

You can pay by card or invoice

From

$2,600.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The LUKOIL-operated Kandim-Khauzak-Shadi PSC will be Uzbekistan's key source of gas production growth over the next decade. The asset includes two separate contract areas in the Amu Darya Basin: the Khauzak-Shadi gas field and the large Kandim gas field and its six satellites .All the fields were discovered in the Soviet era, but had not been developed prior to PSC signature in 2004. The initial ...

What's included

This report contains

  • Document

    Kandim-Khauzak-Shadi

    PDF 491.07 KB

  • Document

    Kandim-Khauzak-Shadi

    XLS 849.50 KB

  • Document

    Kandim-Khauzak-Shadi

    ZIP 1.20 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • PSC
    • Kandim
    • Kandim satellites
    • Khauzak-Shadi
    • Kungrad (relinquished in 2014)
  • Reserves and resources
      • Phase One - Khauzak-Shadi (Khauzak and West Shadi)
      • Phase Two - Kandim Early Gas Project (Kuvachi-Alat and North Shadi)
      • Phase Three - Kandim Gas Processing Plant (Kandim full development)
      • Phase Four - other Kandim satellites (Akkum, Parsankul, Khodzhi and West Khodzhi)
    • Condensate
    • Key development metrics
    • PSC commitments
    • Phase One - Khauzak-Shadi (Khauzak and West Shadi)
    • Phase Two - Kandim Early Gas Project (Kuvachi-Alat and North Shadi)
    • Phase Three - Kandim full development
    • Phase Four - other Kandim satellites
      • Initial transport
      • Exports
    • Liquids
    • Gas
    • Condensate
    • Royalty
    • Cost oil/gas
    • Profit oil/gas
    • Income (profit) tax
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
      • Gazprom
      • China
      • Domestic
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 29 images and tables including:

Tables

  • Key facts: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Participation: Table 1
  • Geology: Table 1
  • Geology: Table 2
  • Geology: Table 3
  • Geology: Table 4
  • Geology: Table 5
  • Geology: Table 6
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Fiscal and regulatory: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

Images

  • Index map
  • Khauzak-Shadi map
  • Kandim map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Kandim-Khauzak-Shadi production profile

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800