Asset Report

Karazhanbas

Get this report

$3,100

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Karazhanbas heavy oil field is located in southwest Kazakhstan. It is operated by a JV of state-owned NC KazMunaiGas and CITIC Resources (China). The field has been producing since 1980, with output recently at a plateau of about 40,000 b/d.EOR techniques are critical to the development, alongside extensive drilling of low-productivity wells. The licence only allows production from depths of up to 500 metres.Karazhanbas oil is sold to domestic and export markets. The field has direct ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Licence
      • Licence extension
      • Depth limit
    • Corporate
      • Participation history
    • Structure
    • Reservoirs
    • Historical E&A activity
    • Recent and future E&A activity
      • Karazhanbas More
    • Overview
    • Oil
      • In place volumes
      • Reported reserves
    • Gas
    • Oil
      • Historical production
    • Gas
    • Key development metrics
    • Exports
      • Current routes
      • Previous routes
    • Domestic
      • Aktau bitumen plant
      • Domestic oil sales
    • Current routes
  • Costs
    • Mineral Extraction Tax (MET)
    • Liquids MET reductions
    • Rent Tax on Export
    • Oil Export Customs Duty (ECD)
    • Corporate Income Tax
    • Excess Profit Tax (EPT)
    • Bonuses
    • Social investment programme
    • Fines and penalties
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
      • Exports
      • Domestic
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index map
  • Karazhanbas map
  • Exploration: Table 1
  • Capital costs
  • Costs: Table 2
  • Operating costs
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining Present Value Price Sensitivities
  • Geology: Table 1
  • Geology: Table 2
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Karazhanbas production profile
  • Infrastructure: Table 1
  • Participation: Table 1

What's included

This report contains:

  • Document

    Karazhanbas

    PDF 4.44 MB

  • Document

    Karazhanbas

    XLS 720.00 KB