The offshore Konzi field was discovered in 1979 by Elf Gabon. Production from the field began in 1984 using two platforms linked by pipeline to the Cap Lopez export terminal. The field was shut-in during 2001 to allow additional crude from the onshore M'Boumba field. There are no plans to re-start Konzi production at present. In November 1978, Elf Gabon discovered the small onshore M'Boumba field in northern Gabon. Production began in 1979 and crude is exported ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Exploration costs
    • Capital costs
    • Operating costs
  • Fiscal and regulatory
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
    • Cash Flow

Tables and charts

This report includes 30 images and tables including:

  • Key facts: Table 1
  • Index map
  • Konzi and M'Boumba map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Konzi field production profile
  • M'Boumba field production profile
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Konzi Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities
  • M'Boumba Cash Flow
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Present Value Price Sensitivities

What's included

This report contains:

  • Document

    Konzi and M`Boumba

    PDF 6.29 MB