Asset Report

Lematang

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Singa gas field is the only onstream field in the Lematang PSC. Harimau, the first producing field on block, ceased in 2010. The Singa field primarily supplies power generation and fertiliser companies in South Sumatra. Gas sales agreements for the PSC gas are grouped along with the larger, Medco-operated South Sumatra PSC. The Singa facilities are designed to accommodate high pressure, temperature, and CO2. Raw gas with a CO2 content of 32-38% is processed through parallel amine and membrane units capable of processing 25 mmcfd each. The facility also includes an incineration system to eliminate H2S. In April 2017, a 10-year licence extension was awarded to Medco Energi.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
    • Current development
      • Singa
    • Historical development
      • Harimau
  • Infrastructure
  • Costs
    • Current sales contracts
  • Fiscal and regulatory
  • 2 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Lematang Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production Profile
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • 10 more item(s)...

What's included

This report contains:

  • Document

    Lematang

    PDF 9.82 MB

  • Document

    Lematang

    XLS 773.50 KB