Asset Report

Liard

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

18 August 2017

Liard

Report summary

Paramount Resources divided the Fort Liard region into three distinct operational areas, each of which was run independently. This analysis covers the Liard field, which was developed in partnership with Point North Energy and some additional minor interest holders. The other two fields in the region are covered in the separate Fort Liard and Southeast Fort Liard analyses.The Liard field was discovered in 1986 by Northcor, but not brought onstream until 2000. The gas was transported via ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Capital Costs
    • Operating Costs
      • Field Cost
      • Transportation Tariffs
  • Sales contracts
  • Fiscal and regulatory
    • Discount rate and date
    • Inflation rate
    • Gas price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 17 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Liard Map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production Profile
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Costs: Table 1

What's included

This report contains:

  • Document

    Liard

    PDF 1.00 MB

  • Document

    Liard

    XLS 317.50 KB

  • Document

    Liard

    ZIP 972.50 KB