Asset Report

Mabruk

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Mabruk field is located onshore in Libya's Sirte Basin, 140 kilometres southwest of the Es Sider terminal. The field was discovered by Esso Sirte in 1959 and brought onstream by Total (now TotalEnergies) in 1995.The field was attacked by armed groups in 2015. Surface facilities and the field's processing trains sustained significant damage. The operating joint venture, Mabruk Oil Operations, invoked Force Majeure in 2015 and it was not lifted until early 2023. A Final Investment ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Current development
    • Historical development
    • Phase one
    • Phase two
    • Dahra southeast project
    • Garian horizon development
  • Infrastructure
    • Capital costs
    • Operating Costs
    • Original terms
      • Government Priority Oil
      • Distribution of Costs
      • Production Sharing
    • Mabruk - Dahra and Garian (D and G) terms
      • Production Sharing
    • EPSA IV terms
      • Distribution of costs
      • Production sharing
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
    • Cash Flow

Tables and charts

This report includes 35 images and tables including:

  • Key facts: Table 1
  • Index map
  • Mabruk (NC17) map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Geology: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Production profile
  • Production profile (post-contract)
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Mabruk
  • Economic analysis: Table 2
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining Present Value Price Sensitivities
  • Post-contract cash flow
  • Economic analysis: Table 4
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3
  • Fiscal and regulatory: Table 4

What's included

This report contains:

  • Document

    Mabruk

    PDF 5.82 MB