Asset report

Mengo-Kundji-Bindi

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Mengo-Kundji-Bindi (MKB) Block is located onshore Congo. The block contains four fields: Bindi, Kundji, Mengo and Tchiniambi. Elf Congo initially developed the Mengo, Kundji and Bindi fields between 1979 and 1993. However, Elf ceased production from the fields. In 2007, SNPC was awarded its first operated licence for the MKB Block. In 2009, pilot project was started on Kundji, with two wells drilled. A further six pilot wells were ...

What's included

This report contains

  • Document

    Mengo-Kundji-Bindi

    PDF 8.78 MB

  • Document

    Mengo-Kundji-Bindi

    XLS 609.00 KB

  • Document

    Mengo-Kundji-Bindi

    ZIP 9.30 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
    • Recent E&A work (post-2007)
  • Reserves and resources
    • Historical development
    • Current development
  • Development
  • Infrastructure
    • Exploration Costs
    • Abandonment Costs
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

Images

  • Index Map
  • Mengo-Kundji-Bindi Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • MKB Production Profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Ibigwe

Asset report

Zarat

Asset report

OML 122 (Bilabri)

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898