Milne Point
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Capital Expenditure
- Operating Costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Milne Point Unit Index MapMilne Point Field MapMilne Point Participation
-
Reservoir CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileMilne Point SchematicCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sleipner Condensate Pipeline and Terminal
The Sleipner Condensate Pipeline transports condensate and NGL from the Sleipner Øst platform to the Statpipe.
$2,580Sangachal Terminal
The BP-operated Sangachal Terminal is one of the world's largest integrated oil and gas processing complexes. It is located 55 ...
$2,580El Furrial
The 1986 discovery of the giant El Furrial field was the first significant discovery to be made in South America in over 25 years and ...
$3,720